Rockford Public Library

Disciplines

  • Architecture

Types

  • Cultural

Location
Rockford, IL

Size
68, 000SF

a new public library returns to its historic site
GWA Dots
The main branch of the Rockford Public Library has been located along the banks of the Rock River since 1902. Prior to the library’s construction the property was used as a gasification site. In order to remediate the site, the existing 88,000 SF structure needed to be removed, which entailed an extensive analysis of current and future needs as well as possible temporary and new locations for the main library. GWA teamed up with Engberg Anderson Architects to deliver a complete plan that entailed moving the main operations to a renovated temporary location just blocks away from the current site, and a decision to rebuild the main library on the remediated historic location.

from gasification site to 21st century library

The design of the new library began by collecting thoughts and ideas from the community. The design team worked with staff to accommodate the program requirements along with the community’s interests to design a library of the future. The new library is slated for construction the first quarter of 2021 with plans to house many of the same great spaces that were found at the old library. New innovative uses will also be debuted including media and maker labs, exterior rooftop terraces, several multi-purpose rooms, a two-story gallery, dedicated teen and children’s areas, and a quiet reading room with a view that can’t be beat.
embracing the riverfront and an environment for learning
GWA Dots
The new library will embrace its riverfront location like never before. An enhanced riverfront walk will create a comfortable place to linger, eat lunch, and enjoy the view. The terraced areas both within the building and along the river offer a variety of opportunities for activities in plein air. The building’s streetface along Wyman St. will offer a new feature of a drop-off and pick-up window for easier and quicker access to library resources.

related projects

Historic preservation and design - The Standard

The Standard

Rockford, IL

Architecture

Originally built in 1916, 214 East State Street is Rockford’s first non-combustible structure and hosts impressive concrete structural columns that add to the grandeur of the space.

Interior image of Haute Bridal Official

Haute Bridal Official

Beloit, WI

Architecture, Interior Design

With specialized displays for high-end gowns, a runway space for showings, and a spa & salon beauty room, the transformation of this vacant storefront into a couture boutique has helped bring life to the continued development of the downtown Beloit region.

Main Office Architecture - Wahl Clipper

Wahl Clipper Corporate Headquarters

Sterling, IL

Architecture, Interior Design

Wahl Clipper Corporation is a world leader in professional and home grooming devices. Founded in Sterling, Illinois over one hundred years ago, the company wanted to develop a new corporate headquarters building that could better respond to an increasing global demand for its products.